Serving Las Vegas, Henderson, Summerlin, North Las Vegas and Boulder CityOpen 7 days, scheduled around your trades (928) 303-5163

Post Construction Cleaning

Final Phase handles the clean that turns a finished build into a space you can hand over: rough cleans while trades are still working, a detailed final clean before the walkthrough, and a touch-up right before move-in.

Office lobby after a Final Phase post construction clean
Phases
Rough, final and touch-up
Projects
Commercial, residential, renovations, TIs
Scheduling
7 days a week, around your trades
Supplies
We bring every supply and tool

What is post construction cleaning?

Post construction cleaning is the specialized cleaning that happens after construction or renovation work, and it is a different job from regular janitorial service. Construction leaves fine drywall dust in every vent and on every ledge, paint and adhesive on floors and glass, protective film and stickers on fixtures, and packaging and scrap in every room.

A builder-grade clean removes all of it in the right order, without scratching new finishes, so the space passes the walkthrough and is ready for the owner, the tenant or the buyer. Final Phase does this work in phases that line up with your build schedule, so nothing gets cleaned twice and nothing gets missed.

The three phases of post construction cleaning

Most projects need all three. Each phase has its own page with the full scope.

Phase 01

Rough Clean

After drywall, before paint and finish trades

We remove construction debris, scrap, packaging and the heavy layer of drywall dust so painters, flooring installers and finish carpenters walk into a workable site.

  • Debris and scrap cleared from every room
  • Floors swept and vacuumed
  • Window sills, frames and tracks cleared
  • Dust removed from framing, boxes and ledges
Rough Clean
Phase 02

Final Clean

After the last trade, before the walkthrough

The detailed, top-to-bottom clean. Every surface, fixture, cabinet, vent and pane of glass is cleaned so the space looks finished, because it is.

  • Protective film, stickers and tape removed
  • Interior glass streak-free
  • Cabinets and drawers inside and out
  • Fixtures, vents, switch plates and hardware detailed
Final Clean
Phase 03

Touch-Up Clean

Right before move-in, closing or opening day

After punch-list repairs, inspections and furniture delivery, a final light pass removes the fresh dust and fingerprints so day one looks like the day we finished.

  • Dust from punch-list repairs removed
  • Floors re-vacuumed and mopped
  • Glass and mirrors re-polished
  • Final walkthrough with you
Touch-Up Clean

What's included in a final construction clean

We clean against a checklist you can see. Download the full post construction cleaning checklist.

Floors

  • Sweep, vacuum and damp mop every hard floor
  • Scrape paint, drywall mud and adhesive
  • Vacuum new carpet with HEPA filtration
  • Detail baseboards, thresholds and corners

Windows and glass

  • Remove stickers, labels, tape and film
  • Clean interior glass and mirrors streak-free
  • Clean tracks, frames and sills
  • Polish glass doors and partitions

Kitchens and break rooms

  • Cabinets and drawers inside and out
  • Countertops cleaned and residue removed
  • Appliances wiped inside and out, film removed
  • Sinks and faucets descaled and polished

Restrooms

  • Toilets, sinks, tubs and showers cleaned
  • Tile, grout and glass enclosures detailed
  • Mirrors and fixtures polished
  • Partitions and accessories wiped

Air and ceilings

  • Vent covers, returns and diffusers
  • Ceiling fans and light fixtures
  • High ledges and tops of door frames
  • Corners and cobwebs

Walls, trim and doors

  • Spot clean scuffs and marks
  • Doors, frames and hardware wiped
  • Switch plates and outlets dusted
  • Railings and trim detailed
Lobby with construction dust before cleaningLobby after the final clean
Same lobby, before and after a final construction clean.

Projects we clean

We also clean for general contractors, home builders, property managers, medical offices and restaurants. See every industry.

How a post construction clean works

  1. 1

    Walkthrough and bid

    Send the plans or walk the site with us. We look at square footage, finishes, phase and timeline, then send a clear written bid.

  2. 2

    Schedule around your trades

    We book rough, final and touch-up cleans where your schedule needs them, including evenings and weekends.

  3. 3

    Clean to the checklist

    Our crew works room by room, top to bottom, against a checklist you can see.

  4. 4

    Sign-off walkthrough

    We walk the space with you and close every item before we call the job done.

Why builders choose Final Phase

The last impression is ours

Months of work get judged in the first minutes of a walkthrough. We clean like it.

One crew, every phase

The same team handles rough, final and touch-up cleans, so nothing falls between visits.

Built around your schedule

Seven days a week, early or late, so inspections and closings do not slip.

Fully equipped

We bring the supplies, tools and equipment. You do not stage anything for us.

Post construction cleaning service areas

Each city has its own page with local project types and scheduling details.

Post construction cleaning FAQ

What is post construction cleaning?

It is the cleaning done after construction or renovation work: removing construction dust, debris, protective film, stickers, paint and adhesive residue from every surface, usually in rough, final and touch-up phases.

When should I schedule post construction cleaning?

Schedule the rough clean once drywall is finished, the final clean once the last trade is out, and a touch-up right before move-in or opening. Send us the schedule and we will plan all three.

What is the difference between a rough clean and a final clean?

A rough clean happens mid-build and clears debris and heavy dust so trades can keep working. A final clean happens after all trades finish and details every surface for the walkthrough.

How long does a final construction clean take?

It depends on the square footage, the finishes and how much dust the build left behind. We give you a timeline with the bid.

Do you remove construction debris?

We clear the dust, scraps, packaging and small debris inside the space. Large dumpster loads are typically handled by your hauler.

Do you clean residential new construction?

Yes. We clean new homes and model homes for builders as well as commercial projects.

Do you bring your own supplies and equipment?

Yes. Final Phase brings every cleaning supply and tool the job needs.

How is post construction cleaning priced?

Every bid is based on square footage, phase, finishes, access and timeline. Request a bid and we will send a written quote. See the pricing guide for what affects cost.

Your build is almost done. Let's finish it.

Rough, final and touch-up cleans scheduled around your trades, 7 days a week.

CallGet a free bid